Jelly Roll Insert

  • 제품
  • 제품
  • 제품
  • 제품

Description

Automated equipment to supply wound jelly-roll (J/R) into the equipment, apply bottom insulator and insert jelly-roll into the can for cylindrical secondary battery assembly

Features

  • Multi-tab Available for Cathode
  • Tab Position Precise Alignment & Tab Damage Prevention
  • Minimized Can Surface Scratch Occurrence
  • Vision Inspection of Bottom Insulator & Tab Condition

(-)Cathode Tab Welding M/C

  • 제품
  • 제품

Description

Equipment that performs (-)tab welding after J/R hole reform and tensile test after tab alignment

Features

  • Vision Inspection of J/R Hole Outer Diameter and Defect Discharge
  • Monitoring System for Quality Control

Top Cap Welding

  • 제품
  • 제품

Description

Cylindrical secondary battery assembly equipment to weld top cap & can using laser

Features

  • Tab Position Alignment
  • Tab Cleaning (dry/wet/laser)
  • Vision Inspection of Welding Quality
  • Welding Strength Inspection

Crimping(Sizing)

  • 제품
  • 제품

Description

Process equipment that makes the total height uniform by crimping and pressing the top of the cell to prevent the falloff of safety vent

Features

  • Rotary Type
  • In-line conveyor using single-purpose carrier
  • Height Check Measurement Using Displacement Sensor
  • Vision Inspection of External Diameter & Top Cap Scratch
  • Data Management for Each Measured Value by Head

Washing M/C

  • 제품
  • 제품

Description

Equipment for removing foreign matter and electrolyte from the surface of the cell before battery cell tubing.

Features

  • Anti-rust Oil Application to Prevent Battery Rust
  • Drying after 1st and 2nd Washing

Selector

  • 제품
  • 제품

Description

Equipment that detects cell loaded Tray ID value after filling/discharge has been completed and defects have been identified.

Features

  • Pick & Place Robot
  • Link to the Upper Scheduler
  • Tray Position Alignment

Cell Characteristics Measuring/ Grading M/C

  • 제품
  • 제품

Description

After formation process, IR-OCV measurement and IT system report, the result of the determination is obtained from the IT system, and separation by quality and grading is performed.

Features

  • Measurement Data is Reported to IT System Based on IT Specifications
  • Product-specific good and defective / rework grade discharge / return unit